Compliance and audits
AQL sampling inspection: how to read an AQL chart and sampling plan
AQL sampling decides whether to accept a whole lot from a random sample: the lot size and the inspection level give a sample size code letter, the code letter gives the sample size, and the AQL gives the acceptance number (Ac) and the rejection number (Re). The lot is accepted when the sample holds Ac or fewer nonconforming units and rejected when it holds Re or more.
On this page
How to read an AQL sampling plan, step by step
An AQL table is two tables used one after the other. The first turns the lot size and the inspection level into a sample size code letter. The second, the master table, turns the code letter and the AQL into a sampling plan: the sample size n, the acceptance number Ac and the rejection number Re. MIL-STD-105E describes its plans this way, as indexed by the AQL together with the code letter, and ANSI/ASQ Z1.4 and ISO 2859-1 use the same structure.
- Agree the AQL for each class of nonconformity, for example one value for major and another for minor nonconformities. An AQL is stated in percent nonconforming or in nonconformities per hundred units.
- Agree the inspection level. MIL-STD-105E says general level II is the one normally used.
- Count the lot size: the number of units you will accept or reject together.
- In the sample size code letter table, find the row for the lot size and the column for the inspection level. That gives a code letter.
- Open the master table for the inspection in force: normal, tightened or reduced. The code letter row gives the sample size n, and the AQL column gives Ac and Re.
- If the cell shows an arrow, follow it to the first plan it points to and use that plan, sample size included. If the new sample size is as large as the lot, inspect every unit.
- Draw n units at random from the whole lot and inspect each one against the requirement.
- Count the nonconforming units. Accept the lot if the count is Ac or less. Reject it if the count is Re or more.
- Record the result and check the switching rules before the next lot arrives.
Worked example: a lot of 2,000 parts at AQL 1.0
The values here come from MIL-STD-105E, the cancelled US military standard, whose full text the Department of Defense still publishes free in its ASSIST database. They show the method. For a contract, take the values from the standard and edition the contract names.
A shop receives one lot of 2,000 turned bushings. The purchase order calls for general inspection level II, normal inspection and an AQL of 1.0 for major nonconformities. Table I of the standard puts a lot of 1,201 to 3,200 units at code letter K for level II. Table II-A, the master table for single sampling under normal inspection, gives code letter K a sample of 125 and, in the AQL 1.0 column, Ac 3 and Re 4.
So the inspector draws 125 bushings at random from the whole lot. With 3 or fewer major nonconformities in the sample the lot is accepted. With 4 or more it is rejected.
| Step | Where to look | Result |
|---|---|---|
| Lot size | Count the lot | 2,000 |
| Code letter | Table I, row 1,201 to 3,200, general level II | K |
| Sample size | Table II-A, row K | 125 |
| Accept and reject numbers | Table II-A, row K, column 1.0 | Ac 3, Re 4 |
Inspection levels: general I, II and III, special S-1 to S-4
The inspection level sets how the sample size relates to the lot size. MIL-STD-105E clause 4.9.1 gives three general levels. Level II is the one normally used. Level I may be used where less discrimination is needed and level III where more is needed. A higher level usually means a larger sample for the same lot, and with it a plan that separates good lots from bad ones more sharply.
For the same lot of 2,000, level I gives code letter H and a sample of 50, and level III gives code letter L and a sample of 200.
The four special levels, S-1 to S-4, are for cases where the sample has to stay small and larger sampling risks can be tolerated. Destructive or costly tests are a common case. The standard warns against pairing them with AQLs they cannot support. Its own example: under S-1 the code letters go no further than D, a sample of 8, so S-1 is of no use with an AQL of 0.10, where the smallest sample is 125.
Normal, tightened and reduced inspection: the switching rules
A sampling scheme is more than one plan. It has a normal, a tightened and a reduced plan, with rules for moving between them, so inspection reacts to the supplier's recent record. Inspection starts at normal. MIL-STD-105E applies the rules to each class of defects or defectives on its own, and counts lots on original inspection only, leaving resubmitted lots out.
ISO 2859-1:2026 keeps normal, tightened and reduced inspection and adds a skip-lot stage, entered from reduced inspection, with rules of its own. Check its clauses for the exact conditions. The table gives those of MIL-STD-105E clause 4.7 and clause 4.8.
| Switch | When it happens |
|---|---|
| Normal to tightened | 2 of 2, 3, 4 or 5 consecutive lots are rejected on original inspection. |
| Tightened to normal | 5 consecutive lots are accepted on original inspection. |
| Normal to reduced | All of these hold: the preceding 10 lots, or more where the note to Table VIII calls for it, were on normal inspection and all were accepted, the nonconforming count in their samples is within the limit numbers in Table VIII, production is at a steady rate, and reduced inspection is considered desirable. |
| Reduced to normal | Any one of these: a lot is rejected, a lot is accepted under the special rule for a count between Ac and Re, production becomes irregular or delayed, or other conditions call for normal inspection. |
| Inspection stops | The number of lots not accepted in a run of consecutive lots on original tightened inspection reaches 5. Inspection under the standard resumes only after corrective action has been taken, and then at tightened. |
What an AQL does not promise
An AQL is not the worst quality a buyer can receive. MIL-STD-105E defines it, for a continuing series of lots, as the quality level that is the limit of a satisfactory process average. The note under the definition adds that the AQL alone does not give the chance of accepting or rejecting any one lot, and sends the reader to the plan's operating characteristic (OC) curve for that.
The OC curve plots the chance of accepting a lot against its percent nonconforming. Section 6.2.3.2 of the NIST/SEMATECH e-Handbook of Statistical Methods calculates it with the binomial distribution, which fits when the lot is much larger than the sample. The table applies it to the plan in the example, n = 125 with Ac = 3.
A lot at three times the AQL still passes about half the time. Lots well below the AQL are almost always accepted, which protects the supplier. To protect the buyer against a single bad lot, look at the other end of the curve. The e-Handbook (section 6.2.2) calls that level the LTPD, the lot tolerance percent defective, a defect level the consumer would not accept, and defines the consumer's risk as the chance that the plan accepts a lot at the LTPD.
An AQL is not a licence to deliver defects either. MIL-STD-105E clause 4.4.2 says that choosing or using an AQL does not give the supplier the right to supply any defective unit.
| Lot percent nonconforming | Chance the lot is accepted |
|---|---|
| 0.5% | 99.6% |
| 1% | 96% |
| 2% | 76% |
| 3% | 48% |
| 5% | 12% |
How to choose an AQL for each class of nonconformity
Classify the possible nonconformities by how serious they are, then give each class its own AQL. MIL-STD-105E uses three classes. A critical defect is one that judgement and experience say would make the product hazardous or unsafe for the people who use or maintain it. A major defect is one, other than critical, that is likely to cause a failure or to reduce the usability of the unit materially. A minor defect is not likely to do either, or departs from a standard in a way that has little bearing on use.
Clause 4.4.3 lets you set an AQL for a group of defects or for single defects. AQLs of 10.0 or less can be stated in percent defective or in defects per hundred units. Larger AQLs are stated in defects per hundred units only.
The values are a commercial and risk decision, not something the standard fixes. Common practice is a lower AQL for major than for minor nonconformities and no sampling acceptance for critical ones, which are often checked on every unit. ISO 2859-1 has a clause of its own on a special reservation for critical classes. In automotive supply, IATF 16949 clause 8.6.6 sets the acceptance level for attribute sampling at zero defects.
Count the same way the AQL is stated. A unit with three defects counts once in a plan stated in percent defective and three times in a plan stated in defects per hundred units.
MIL-STD-105E, ANSI/ASQ Z1.4 and ISO 2859-1: which one applies?
The tables share one family history. Section 6.2.3.1 of the e-Handbook traces it: sampling tables from the Second World War became MIL-STD-105A in 1950 and MIL-STD-105D in 1963. ANSI adopted 105D as Z1.4 in 1971, ISO adopted it with minor changes as ISO 2859 in 1974, and 105E followed in 1989. That origin is why many plants in Mexico and Latin America still call the AQL table the tabla militar estándar.
The acronym stayed while the words changed. MIL-STD-105E says acceptable quality level, and ISO 2859-1 says acceptance quality limit.
| Standard | Status | Notes |
|---|---|---|
| MIL-STD-105E (10 May 1989) | Cancelled | Cancelled on 27 February 1995. The current cancellation notice, Notice 3 of 6 February 2008, refers future acquisitions to MIL-STD-1916 or ANSI/ASQ Z1.4. The text stays public in ASSIST. |
| ANSI/ASQ Z1.4 | Current, sold by ASQ | The US civilian successor to MIL-STD-105E, with the same structure of AQLs, code letters and switching rules. |
| ISO 2859-1:2026 | Current, third edition, published in January 2026 | Replaced ISO 2859-1:1999 with its 2001 corrigendum and 2011 amendment. Adds skip-lot sampling procedures. |
| DIN ISO 2859-1:2014-08 | Listed as current by DIN | The German and English edition of ISO 2859-1:1999 with its 2001 corrigendum and 2011 amendment. |
| NMX-Z-12/2-1987 | Listed as in force by the Secretaría de Economía | Mexican standard on sampling for inspection by attributes, Part 2: sampling methods, tables and charts. Published in the DOF on 28 October 1987. |
Forming the lot and drawing the sample
A plan only works on a real lot. MIL-STD-105E clause 4.3 asks that each lot consist, as far as practicable, of units of one type, grade, class, size and composition, made under essentially the same conditions at essentially the same time. Do not merge two production runs, two cavities or two suppliers into one lot to save inspection.
Draw the sample at random from the whole lot, not from the top layer of the first box. Where a lot arrives as several boxes or sublots, the standard allows representative sampling: units from each part in proportion to its size, chosen at random within it.
Keep the lot identified and intact until the decision is made. On receipt from a supplier, the AQL plan is one step of a wider receiving inspection that also checks the paperwork, the identity and the condition of the goods.
How Axiospec fits with sampling inspection
Axiospec is calibration management software. It does not draw samples, choose sampling plans or decide whether a lot passes. It keeps the gauges an attribute inspection depends on. Go/no-go plugs, thread gauges and the calipers used on a sample can each be an instrument on the register, with its calibration history, certificates and next due date.
Where Gage R&R studies are switched on, a manager can record an attribute agreement study on a gauge's instrument page. An accepted Fail or Damaged result puts a gauge in quarantine. With a standard such as ISO 9001 or IATF 16949 selected for the workspace, any approved Fail, Damaged or Pass with an as-found reading out of tolerance needs an impact written, and any not yet written show in Needs attention. That is the place to note which accepted lots the gauge checked. The free plan covers up to 50 active instruments. A new workspace starts with a 45-day trial of Professional, with room for 1,500 active instruments and no credit card.
Common questions
- What is AQL in sampling inspection?
- AQL stands for acceptable quality level in MIL-STD-105E and acceptance quality limit in ISO 2859-1. It is the quality level, in percent nonconforming or nonconformities per hundred units, that is the limit of a satisfactory process average over a series of lots. Together with the sample size code letter it selects the sampling plan.
- How do you read an AQL chart?
- Find the sample size code letter from the lot size and the inspection level, then read the sample size from that letter's row in the master table. The AQL column gives the acceptance number Ac and the rejection number Re. Accept the lot when the sample holds Ac or fewer nonconforming units and reject it at Re or more.
- Does an AQL of 1.0 mean a lot is at most 1 percent defective?
- No. The AQL describes a satisfactory process average, not a ceiling on each lot. With the plan n = 125 and Ac = 3, a lot that is 3 percent nonconforming is still accepted about 48 percent of the time.
- Is MIL-STD-105E still valid?
- No. MIL-STD-105E was cancelled in 1995, and its current cancellation notice of 2008 refers future acquisitions to MIL-STD-1916 or ANSI/ASQ Z1.4. Its text is still public, and some older contracts and drawings still cite it.
- What is general inspection level II?
- It is the general inspection level that MIL-STD-105E says is normally used. Level I gives the same sample or a smaller one for the same lot, and level III the same or a larger one. The special levels S-1 to S-4 keep samples small where larger sampling risks can be tolerated.
- What happens when a lot fails AQL inspection?
- The lot is not accepted as submitted. Depending on the contract it is returned, sorted or reworked and then resubmitted. Under MIL-STD-105E, 2 rejected lots within 5 consecutive lots also move inspection from normal to tightened.
Put it into practice
Got a gage list? Send it over and we load it for you, usually in a couple of business days. Free on every plan. Then log every calibration to a tamper-evident audit trail and produce records on demand.
Axiospec is a documentation and workflow tool. It helps you keep clean, traceable, audit-ready records. Certification depends on your own processes, scope and assessor.
Take the audit-prep checklist with you
First the checklist, with each item phrased the way an auditor asks it. Then four short emails with practical tips. You can unsubscribe in one click.