Receiving inspection: what to check when purchased material arrives
Receiving inspection, also called incoming inspection, is the check a plant makes on purchased material before it goes into stock or production: the paperwork matches the order, the goods are what their labels and certificates say, the quantity and condition are right and, where the risk calls for it, a sample is measured against the drawing. How much you check depends on what the part does in your product and on the supplier's record.
On this page
What does receiving inspection check?
Work through the checks in the order the material arrives. The paperwork and identity checks take minutes and catch mix-ups such as a wrong drawing revision or the wrong material before anyone measures anything. Measurement comes last, and only where the inspection plan for that part asks for it.
| Check | What to look at | Evidence to keep |
|---|---|---|
| Order | Supplier, part number, drawing revision, quantity and any special requirements, against the purchase order | Purchase order number on the receiving record |
| Documents | Packing list, certificate of conformance, material certificates and any test reports the order asks for | Copies filed with the receiving record |
| Identity | Part marking, labels and lot or heat numbers, and whether they match the certificates | Lot or heat number recorded |
| Quantity | Count or weigh against the packing list and the order | Quantity received |
| Condition | Transport damage, corrosion, contamination and protective packaging such as caps or ESD bags | Notes and photos of any damage |
| Characteristics | A sample measured or gauged against the drawing, as the inspection plan for the part sets out | Readings or pass and fail counts, the plan and the gauges used |
Certificates: what they prove and what they do not
A certificate of conformance is the supplier's statement that the goods meet the order. It is a declaration, not a measurement, and it is worth as much as the supplier's own controls. Read it for the purchase order, the part number and revision, the quantity and the lot.
Material certificates carry results. For metallic products, EN 10204 sets out the types of inspection documents, including the inspection certificates 3.1 and 3.2, and separates specific from non-specific inspection. In Germany it is published as DIN EN 10204:2005-01. Check that the heat or batch number on the certificate matches the marking on the material, and that the values sit inside the material specification on your order.
A calibrated instrument back from a lab is a delivery too. Check its calibration certificate before the instrument goes back into use: the serial number, the as-found readings if you asked for them, the measurement uncertainty and the traceability statement.
How much to inspect: every unit, a sample or skip-lot
ISO 9001 does not prescribe receiving inspection as such. Clause 8.4 asks you to make sure that externally provided products conform to requirements, and clause 8.4.2 asks for controls whose type and extent reflect how much the supplier's product can affect your own. Receiving inspection is one way to meet that. In practice, others include inspection at the supplier's plant and review of data the supplier sends.
IATF 16949 is more specific. Clause 8.6.4 asks an automotive supplier to assure the quality of what it buys by one or more methods: statistical data from the supplier, receiving inspection or testing such as sampling based on performance, second-party or third-party audits of the supplier backed by records of acceptable deliveries, evaluation by a designated laboratory, or another method agreed with the customer.
Within receiving inspection, the choice is how many units to check. Check every unit when one bad part is unacceptable and the check is quick and does not destroy the part. Sample when lots are large and a statistical decision is acceptable: an AQL plan from ISO 2859-1 or ANSI/ASQ Z1.4 gives the sample size and the accept and reject numbers.
Skip-lot inspection checks only some lots from a supplier with a proven record. Section 6.2.7 of the NIST/SEMATECH e-Handbook of Statistical Methods describes it: lots are inspected normally until a set number in a row have been accepted, then only a random fraction of lots is inspected, and a rejected lot sends the supplier back to normal inspection. ISO 2859-1:2026 added skip-lot procedures to its sampling scheme.
Gauges used at receiving inspection
A receiving decision is only as good as the gauge behind it. ISO 9001 clause 7.1.5 asks for measuring resources that suit the job and, where measurement traceability is required, are calibrated or verified at set intervals or before use against standards traceable to international or national standards. Check that a gauge is in calibration before it is used, and record which gauge measured which lot.
Go/no-go plug, ring and thread gauges suit fast receiving checks of holes, shafts and threads, but they wear in use and need their own calibration. Where inspectors judge by eye or by feel, an attribute agreement study shows whether they reach the same decision on the same parts.
Using supplier history to adjust inspection
Receiving results are also supplier performance data. Lots accepted and rejected, the nonconformities found and the parts per million rejected show which suppliers need closer checks and which have earned skip-lot inspection or dock-to-stock, where material goes straight to stock without inspection.
IATF 16949 clause 8.4.2.4 names the supplier performance indicators an automotive supplier has to monitor at a minimum: conformity of delivered product to requirements, customer disruptions at the receiving plant such as yard holds and stop ships, and delivery schedule performance.
Tighten inspection after a rejected lot, a change at the supplier or a long gap in supply. Loosen it only on a record you can show an auditor. The switching rules in the sampling standards do this for one part number, and the same idea works for a whole supplier.
What to record for each delivery
Keep the record under the lot number so it can be found from either end: from the supplier's lot or from your own finished product. ISO 9001 clause 8.4.1 asks for documented information on how external providers are evaluated, selected, monitored and re-evaluated, and receiving results are often the evidence of that monitoring. The list below is common practice, not a list from the standard.
- Date received, supplier, purchase order and packing list numbers.
- Part number, drawing revision, lot or heat number and quantity received.
- The inspection plan or sampling plan used, with the sample size and the accept and reject numbers.
- Results: readings, or the count of nonconforming units by class.
- The gauges used, by asset number.
- The decision, who made it and when, and where the material went.
When a lot fails: hold, decide, tell the supplier
Mark the lot as rejected and move it to a hold area, or block it in the stock system, so nobody uses it by mistake. Then decide what happens to it: return it to the supplier, sort it 100 percent, rework it, scrap it, or use it as it is under a written concession where your customer's requirements allow one. Record the decision and who made it.
Tell the supplier in writing, with the evidence, and ask for a corrective action that names the root cause and contains stock in transit and at their plant. Inspect the next lots from that supplier more closely until the fix is shown to work.
Buying in Germany: section 377 of the Commercial Code
In Germany, inspecting goods on arrival is also a legal duty between merchants. Section 377 of the German Commercial Code (Handelsgesetzbuch, HGB) applies when the purchase is a commercial transaction for both sides. The buyer has to examine the goods without undue delay after delivery, as far as the ordinary course of business allows, and has to notify the seller of a defect without undue delay. If the buyer gives no notice, the goods count as approved, unless the defect could not be seen in the examination. A defect that shows up later has to be notified without undue delay once it is found.
Supply contracts and quality agreements often adjust how far this duty goes. This is not legal advice: ask your legal department or a lawyer what applies to your contracts.
How to run a receiving inspection, step by step
- Check the delivery against the purchase order: supplier, part number, revision and quantity.
- Check the documents the order requires, such as the certificate of conformance and material certificates, and match their lot or heat numbers to the labels.
- Look over the packaging and the goods for damage, corrosion and contamination.
- Look up the inspection plan for the part: no inspection, a sampling plan or 100 percent inspection, and which characteristics to check.
- Check that the gauges you need are in calibration, then draw the sample at random from the whole lot.
- Measure or gauge the sample and count the nonconforming units against the accept and reject numbers.
- Accept the lot and release it to stock, or reject it, mark it and move it to the hold area.
- Record the results, the plan, the gauges and the decision against the lot number.
- Add the result to the supplier's record and change the inspection level when the record supports it.
How Axiospec helps with the gauges at goods receiving
Axiospec is calibration management software. It does not hold receiving records, sampling plans or lot decisions. It keeps track of the gauges receiving inspection depends on. Calipers, micrometers, go/no-go gauges and thread gauges can each be an instrument on the register with its calibration history, certificates and next due date, so an inspector can see that a gauge is in calibration before using it.
An instrument can be sent out for calibration with the provider, the day it was sent and the day it is expected back, and the lab's certificate can be attached to its calibration record when it returns. An accepted Fail or Damaged result puts the instrument in quarantine. With a standard such as ISO 9001 or IATF 16949 selected for the workspace, any approved Fail, Damaged or Pass with an as-found reading out of tolerance needs an impact written, and any not yet written show in Needs attention. That is where to note which received lots the gauge checked since its last good calibration. The free plan covers up to 50 active instruments. A new workspace starts with a 45-day trial of Professional, with room for 1,500 active instruments and no credit card.
Common questions
- What is receiving inspection?
- Receiving inspection is the check of purchased material when it arrives, before it goes into stock or production. It covers the paperwork, the identity, quantity and condition of the goods and, where the risk calls for it, measurement of a sample against the drawing.
- Is receiving inspection the same as incoming inspection?
- Yes. Receiving inspection, incoming inspection and incoming quality control (IQC) name the same activity. German plants call it Wareneingangsprüfung or Wareneingangskontrolle.
- Does ISO 9001 require receiving inspection?
- Not as such. ISO 9001 clause 8.4 requires you to ensure that purchased products conform to requirements, with controls in proportion to their effect on your own product. Receiving inspection is a common way to do that, beside inspection at the supplier and review of supplier data.
- How many parts should receiving inspection check?
- It depends on the risk of the part and the record of the supplier. Large lots are usually checked with a sampling plan, such as an AQL plan from ISO 2859-1 or ANSI/ASQ Z1.4, which sets the sample size and the accept and reject numbers. Safety-critical features are often checked on every unit.
- What is skip-lot inspection?
- Skip-lot inspection checks only a random fraction of the lots from a supplier whose lots have passed a set number of times in a row. A rejected lot returns the supplier to normal lot-by-lot inspection. ISO 2859-1:2026 includes skip-lot procedures.
- What does section 377 HGB require?
- Between merchants in Germany, the buyer has to examine goods without undue delay after delivery and report defects without undue delay. Goods that are not complained about count as approved, except for defects the examination could not reveal.
Put it into practice
Got a gage list? Send it over and we load it for you, usually in a couple of business days. Free on every plan. Then log every calibration to a tamper-evident audit trail and produce records on demand.
Axiospec is a documentation and workflow tool. It helps you keep clean, traceable, audit-ready records. Certification depends on your own processes, scope and assessor.
Take the audit-prep checklist with you
First the checklist, with each item phrased the way an auditor asks it. Then four short emails with practical tips. You can unsubscribe in one click.
First we email you a link to confirm your address. Nothing else comes until you confirm, and you can unsubscribe from any email after that. See our Privacy Policy.