Cm and Cmk are machine capability indices: they show whether one machine, in one setup, can hold a tolerance, judged on consecutive parts made in a short run. Cm = (USL − LSL) / 6s compares the tolerance with the spread, Cmk = min(USL − x̄, x̄ − LSL) / 3s also counts how far the mean sits from the nearer limit, and customers commonly ask for 1.67 or more.
On this page
How is a machine capability study run?
A machine capability study looks at the machine alone. Everything else that varies in production is held still for a short run: one setup, one operator, one batch of material, one measuring system and no adjustments. What is left in the readings is the machine's own short-term variation. In German the study is the Maschinenfähigkeitsuntersuchung, or MFU.
The parts are made one after another and kept in that order. ISO 22514-3 describes the study for consecutive parts made under repeatability conditions. It does not consider its methods suitable for fewer than 30 observations, and it does not apply when tool wear is expected during the run or when consecutive readings are autocorrelated. Customer guidelines commonly ask for 50 parts, as Hilti's supplier guideline does, and Minitab notes that studies usually take 20 to 50.
Run the study when a machine is new and whenever something changes that could alter its behavior. Hilti's guideline lists the occasions: initial samples, new production equipment, a move to another plant, design changes, machine upgrades, new raw materials and long shutdowns.
Check the measuring system first. Each reading carries the gauge's own variation, and a gauge that scatters makes a good machine look worse. A Type 1 gage study on the gauge you will use is the quick check.
The Cm and Cmk formulas
Data case: n individual readings of one characteristic, one per part, from consecutive parts, with no subgroups. From them you need the mean x̄ and the sample standard deviation s, calculated with n − 1. The tolerance is T = USL − LSL.
Cm, the machine capability index, compares the tolerance with six standard deviations of the machine's spread: Cm = (USL − LSL) / 6s.
Cmk, the minimum machine capability index, takes the distance from the mean to the nearer limit and compares it with three standard deviations: Cmk = min(USL − x̄, x̄ − LSL) / 3s. Written out, it is the smaller of CmkU = (USL − x̄) / 3s and CmkL = (x̄ − LSL) / 3s.
Cmk can never be larger than Cm. The two are equal only when the mean sits in the middle of the tolerance, and Cmk turns negative when the mean lies outside a limit. With one limit only, such as a maximum runout, there is no Cm, and Cmk is the index for the limit that exists.
These are the forms for normally distributed data, where x̄ ± 3s covers 99.73 percent of the output. For other shapes, the quantile method uses the 0.135 and 99.865 percent points of the fitted distribution in place of x̄ − 3s and x̄ + 3s, so Cm = (USL − LSL) / (X99.865 − X0.135). Hilti's guideline describes the spread this way so that it works for any distribution model, and ISO 22514-3 gives a general procedure beside a separate one for normal data.
Cm and Cmk vs Cp, Cpk, Pp and Ppk
The formulas are the same as for Cp and Cpk. Minitab, for one, calculates Cm and Cmk with its Cp and Cpk analysis. What differs is the data. Machine indices use readings that vary only through the machine and the measurement, while process indices use production data that also carry material, operators, environment and time.
That is why a machine's limit is set higher than the process limit. Production adds variation the short study cannot see, so a machine that only just meets the process limit leaves nothing for it. Minitab makes the same point: the benchmark for a machine is usually higher than for a process.
Supplier guidelines put the studies in order. Hilti's runs from the measuring system (Cg and Cgk) through the short-term study (Cm and Cmk) and a preliminary process study (Pp and Ppk) to long-term process capability (Cp and Cpk) once the process is proven stable.
| Indices | What the data cover | Typical data | The question |
|---|---|---|---|
| Cg, Cgk | The measuring system alone | One reference part measured 25 to 50 times | Is the gauge good enough to judge the machine? |
| Cm, Cmk | One machine in one setup, over a short run | About 50 consecutive parts, no adjustments | Can the machine hold the tolerance? |
| Pp, Ppk | The process over a period, using the overall standard deviation | Production readings, whether or not the process is stable | What did the process deliver? |
| Cp, Cpk | The process in statistical control, using the within-subgroup standard deviation | Subgroups from production over a longer period | What can the stable process deliver? |
What Cm and Cmk values are required?
The pass marks are company practice, set by customers in their supplier guidelines. ISO 22514-3 describes how to run the study and calculate the indices. The values a machine must reach are in your customer's requirements or your own acceptance specification.
Minitab notes that many industries use 1.67 as the benchmark. Some customers set a higher bar for the spread than for the centering. Hilti's supplier guideline asks for Cm ≥ 2.00 and Cmk ≥ 1.67 on the features it classes as K, and Cm ≥ 1.67 and Cmk ≥ 1.33 on its H and N features.
The numbers have a plain meaning. Cm says what share of the tolerance the machine's 6s spread takes up. Cmk says how many standard deviations separate the mean from the nearer limit.
| Value | 6s as a share of the tolerance (Cm) | Mean to the nearer limit (Cmk) |
|---|---|---|
| 1.33 | 75% | 4s |
| 1.67 | 60% | 5s |
| 2.00 | 50% | 6s |
Worked example: a turned diameter
A shaft diameter is toleranced at 20.000 ± 0.025 mm, so LSL = 19.975 mm, USL = 20.025 mm and T = 0.050 mm. After warm-up the lathe makes 50 parts in a row with no offsets changed, and each is measured with a gauge that passed its Type 1 study. The readings have x̄ = 20.009 mm and s = 0.0035 mm.
- Cm = 0.050 / (6 × 0.0035) = 0.050 / 0.021 = 2.38
- CmkU = (20.025 − 20.009) / (3 × 0.0035) = 0.016 / 0.0105 = 1.52
- CmkL = (20.009 − 19.975) / (3 × 0.0035) = 0.034 / 0.0105 = 3.24
- Cmk = 1.52, the smaller of the two. Cm passes a 2.00 limit and Cmk fails a 1.67 limit.
How sure is a result from 50 parts?
A study of 50 parts estimates the indices. It does not measure them exactly. The NIST/SEMATECH e-Handbook of Statistical Methods gives a confidence interval for Cp from the chi-square distribution, and it carries over to Cm: multiply the result by √(χ²(α/2, ν) / ν) for the lower bound and by √(χ²(1 − α/2, ν) / ν) for the upper, with ν = n − 1 degrees of freedom.
With 50 parts ν = 49, and at 95 percent confidence the two factors are 0.80 and 1.20. A calculated Cm of 2.00 therefore fits a true value anywhere from about 1.60 to 2.39. A result just above the limit does not prove the machine meets it. Where a result sits close to the limit, more parts narrow the interval. ISO 22514-3 covers confidence intervals in its clause on reporting.
What to check in the data before you trust the result
Plot the readings in production order before you calculate anything. ISO 22514-3 starts its analysis with a run chart and a probability plot, and it treats skewed, bimodal, truncated and censored data as special cases. These patterns are typical in machining.
- A steady trend. Tool wear or warm-up is moving the mean. ISO 22514-3 does not apply while tool wear shows in the run, so warm the machine up or deal with the wear, then start again.
- A step. Something was adjusted or changed partway through, and the run is no longer one setup.
- Two humps. Two spindles, fixtures or cavities have been mixed in one sample. Study each one on its own.
- A cut-off edge. Parts outside a limit were sorted out, or the gauge stops at a limit. The data are truncated, and the normal formulas overstate the capability.
- Readings that repeat a few values. The gauge resolution is too coarse for the tolerance, and s is unreliable.
Cm, Cmk, Pm, Pmk and MFU: which name is which?
The same study goes by several names. English-speaking plants say machine capability study, with Cm and Cmk. German plants say Maschinenfähigkeitsuntersuchung (MFU) and Maschinenfähigkeit, with the same Cm and Cmk symbols.
ISO 22514-3:2020 is Part 3 of the ISO series on statistical methods in process management, capability and performance. It calls the study a machine performance study for measured data on discrete parts, and its indices are Pm and Pmk. It replaced the 2008 edition, and ISO confirmed it in 2026. A customer who cites ISO 22514-3 and asks for Pm and Pmk is asking for a machine study, calculated by the standard's procedures.
The standard's contents run from the preconditions (the number of parts, the material, the measuring system and running the study) through data collection and analysis to the indices, the report with its confidence intervals and the actions that follow a study.
How to run a machine capability study, step by step
- Agree the requirement with your customer: the characteristics, the number of parts, the limits for Cm and Cmk and how data that are not normal will be handled.
- Check the gauge. It should be calibrated and pass a Type 1 study on this tolerance.
- Warm up the machine and set it to the middle of the tolerance. From here on, change nothing.
- Make the parts one after another with one setup, one operator, one batch of material and one program. Number them in production order.
- Measure each part with the same gauge and method, and record every reading in order. Discard none.
- Plot the readings in order and on a probability plot. Look for trends, steps, two humps and truncation before you calculate.
- Calculate x̄, s, Cm and Cmk, or the quantile forms for data that are not normal, and the confidence interval.
- If Cmk fails while Cm passes, re-center the machine and repeat the run. If Cm fails, work on the machine's variation first.
- File the report: the machine, the setup and program, the gauge and its calibration, the readings, the calculation method and the result.
Where Axiospec fits
Axiospec is calibration management software and does not calculate Cm or Cmk. The process capability calculator on this site can. Paste the readings and choose the overall label. It uses the sample standard deviation with n − 1, so the Pp and Ppk it shows are the Cm and Cmk of the normal formulas above.
Axiospec looks after the measuring side of the study. The gauge used for it and its setting masters can be instruments on the register with their calibration history, certificates and next due date. With the Gage R&R studies module switched on, an instrument's page can hold Gage R&R, bias, linearity and attribute agreement studies.
With a standard such as ISO 9001 or IATF 16949 selected for the workspace, any approved Fail, Damaged or Pass with an as-found reading out of tolerance needs an impact written, and any not yet written show in Needs attention. That is where to note whether a machine study measured with that gauge has to be repeated. The free plan covers up to 50 active instruments. A new workspace starts with a 45-day trial of Professional, with room for 1,500 active instruments and no credit card.
Common questions
- What is the difference between Cmk and Cpk?
- Cmk judges one machine on a short run of consecutive parts with everything else held still. Cpk judges the whole process in production, where material, operators and time add their own variation. The formulas are the same, but the data are not.
- How many parts does a machine capability study need?
- Customer guidelines commonly ask for 50 consecutive parts. ISO 22514-3 does not consider its methods suitable for fewer than 30 observations, and more parts narrow the confidence interval on the result.
- What is a good Cmk value?
- 1.67 is a common benchmark, and some customers also ask for Cm ≥ 2.00. The figure is company practice, so use the one in your customer's requirement.
- Why is Cmk lower than Cm?
- Cmk also counts how far the mean sits from the middle of the tolerance. It equals Cm only when the machine runs exactly centered, so a gap between the two points to the setting, not the spread.
- What is an MFU?
- MFU stands for Maschinenfähigkeitsuntersuchung, the German name for a machine capability study. It gives the same Cm and Cmk indices from consecutive parts made in one setup.
- What does ISO 22514-3 cover?
- ISO 22514-3:2020 describes machine performance studies on consecutive discrete parts made under repeatability conditions. It covers data handling, the machine performance indices Pm and Pmk, and the actions at the end of a study.
Put it into practice
Got a gage list? Send it over and we load it for you, usually in a couple of business days. Free on every plan. Then log every calibration to a tamper-evident audit trail and produce records on demand.
Axiospec is a documentation and workflow tool. It helps you keep clean, traceable, audit-ready records. Certification depends on your own processes, scope and assessor.
Take the audit-prep checklist with you
First the checklist, with each item phrased the way an auditor asks it. Then four short emails with practical tips. You can unsubscribe in one click.
First we email you a link to confirm your address. Nothing else comes until you confirm, and you can unsubscribe from any email after that. See our Privacy Policy.